Installation & Commissioning
14+ Years of
Field Experience
Our Services

Site Installation & Commissioning — Done Right the First Time

Proper installation and commissioning are critical for pump reliability and longevity. Our experienced field team ensures every pump is installed to manufacturer specifications.

Precision alignment, correct piping practices, thorough startup procedures and performance testing — for all the brands we supply (Kirloskar, Viking, Sandpiper, Richter, Cognito, Dupro). Optimal performance from day one.

Precision Alignment Piping Review Performance Test Operator Training
What We Offer

Installation & Commissioning Services

From foundation guidance to operator training — every step covered to manufacturer spec.

01

Foundation Guidance

Foundation sizing, bolt pattern & grouting recommendations matched to pump weight & vibration profile.

Sized Right
02

Precision Alignment

Laser / dial alignment of pump-motor coupling for vibration-free, long-life operation.

Laser Aligned
03

Piping Review

Suction & discharge piping layout review — prevents NPSH issues, vibration & cavitation.

NPSH Safe
04

Electrical Setup

Motor rotation check, VFD parameter setup & protection relay configuration.

VFD Ready
05

Startup Procedures

Systematic startup per OEM guidelines — priming, venting, ramp-up & load testing.

OEM Procedure
06

Performance Testing

Flow, head, power & vibration measurement vs. data sheet to confirm duty point.

vs Data Sheet
07

Vibration Baseline

Baseline vibration readings recorded for predictive maintenance reference.

PdM Baseline
08

Operator Training

On-site training for your operators on operation, basic maintenance & warning signs.

On-Site Training
How We Engage

Our 4-Step Installation Process

Structured engagement from pre-installation survey to operator handover.

Step 01

Pre-Installation Survey

Site visit, foundation check, piping review & electrical readiness assessment.

Step 02

Installation & Alignment

Pump mounting, precision alignment, piping connection & grouting per OEM spec.

Step 03

Commissioning & Testing

Startup, performance testing, vibration baseline & load run for duty confirmation.

Step 04

Handover & Training

Operator training, documentation handover, warranty activation & AMC discussion.